|
How to order Residential Title 24 Energy Report (CF-1R) online
New constructions, Additions, Alterations, Secondary units: ADU, ADQ, in-law unit, granny flat, studio, etc. |
|
|
ADU Title 24 energy reports
Non-Residential / Commercial Title 24 reports: ENV / LTG / MECH
|
|
|
|
|
|
New applications, submitted in 2023, should demonstrate compliance with
2022 Building Energy Efficiency Standards
Applications, submitted in 2020/2021/2022, can demonstrate compliance with
2019 Building Energy Efficiency Standards
Applications, submitted in 2017/2018/2019, can demonstrate compliance with
2016 Building Energy Efficiency Standards
|
|
|
1. Send us your drawings, using our e-mail: energy@title24ez.com
• Attach drawings to your e-mail:
- preferred drawings formats: PDF
- other accepted formats: DWG, DXF (AutoCad), JPG, GIF, PNG, etc.
- files can be compressed into zip or rar file to make them smaller.
What we need for energy calculations:
• Scope of work: New Construction/Remodel/Addition, Windows/Floor/Roof/HVAC/WH alteration, replacement, etc.
• Floor plan(s) - Existing and Proposed (if applicable) - with all existing, removed, altered and new Exterior Walls, Windows and Doors dimensions [ see sample T24 plans ]
• Elevation Views (optional)
• Orientation of Building (North arrow)
• Average ceiling height
• Floor: Raised with Crawlspace or Raised without Crawlspace (<18 inches above grade) or Slab-on-grade
• Roof: with Attic or Cathedral
• Heating and Cooling Equipment details:
-- please, describe existing: Split A/C System, Packaged Unit, Heat Pump, Wall Heater, etc.
--
if project add or replace Heating/Cooling Equipment, please, describe proposed: Split A/C System, Packaged Unit, Heat Pump, etc. / gas, propane, electric / # of units / serving zones
• Hot Water System details:
--
if project add or replace Water Heater, please, describe proposed: tank, instantaneous, etc. / gas, propane, electric / # of units / serving zones
• Project name and address
• Project designer name, address, phone (can be owner)
* You will receive confirmation e-mail within minutes
2. We will contact you after reviewing your project
|
|
|
• 2013 Building Energy Efficiency Standards ( effective July 1, 2014 ) requirements
• 2016 Building Energy Efficiency Standards ( effective January 1, 2017 ) requirements
• 2019 Building Energy Efficiency Standards ( effective January 1, 2020 ) requirements
• 2022 Building Energy Efficiency Standards ( effective January 1, 2023 ) requirements
|
|
|
Your business is important to us.
If you do not receive a confirmation e-mail, probably we didn't get the project.
Please call to verify. |
|
|
Most Residential TITLE 24 REPORTS are delivered within 1~2 business days |
|
|
|