|
ADU Title 24 Reports / ADU Title 24 Energy calculation |
|
|
What is an ADU? |
|
|
• An Accessory Dwelling Unit (ADU) is a residential unit that can be added to a lot with an existing single-family home or multi-family development.
• ADUs can be located in a few different places, either detached (such as a separate building in a backyard), attached to a part of the primary residence as an addition, or be converted from an existing garage or other part of the primary residence.
• ADUs are independent rental units that have their own kitchens, bathrooms, and entrances.
• ADUs have many names:
- accessory apartments
- secondary suites
- in-law unit
- granny flat
- studio
- carriage house
- etc.
|
|
|
|
|
|
What is a JADU? |
|
|
• A Junior Accessory Dwelling Unit (JADU) is a part of an existing single-family home that is re-purposed as a private dwelling by incorporating a small kitchen and separate entrance.
• The difference between a JADU and ADU is that JADUs must be located within the existing primary residence and be no greater than 500 square feet in size. • JADUs require owner occupancy either in the primary residence or accessory unit.
|
|
|
ADU, Junior ADU and all other Secondary units must meet Energy Code: Energy Calculations / Title 24 forms need to be submitted to enforcement agencies with Building permit applications |
|
|
Common ADU Title 24 report's scenarios |
|
|
Attached ADU or JADU [ ADU Connected to the existing dwelling ] may show compliance with Title 24 energy requirements as:
• "ADU Addition": newly constructed ADU or existing unconditioned space [ like attached garage, basement, etc ] converted to ADU
• "ADU Alteration": previously conditioned space converted to ADU [ usually part of existing living area]
• "ADU Addition+Alteration": newly constructed space added to previously conditioned space
Detached ADU [Separated from the existing dwelling]
• "Newly constructed ADU": ADU built from the ground up
• "ADU Addition": newly conditioned space [ garage conversion to ADU, workshop conversion to ADU, pool hose conversion to ADU, etc.] |
|
|
How to order Title 24 Energy Report ( form CF-1R) for ADU / JADU online |
|
|
New applications, submitted in 2023, should demonstrate compliance with
2022 Building Energy Efficiency Standards
Applications, submitted in 2020/2021/2022, can demonstrate compliance with
2019 Building Energy Efficiency Standards
Applications, submitted in 2017/2018/2019, can demonstrate compliance with
2016 Building Energy Efficiency Standards
|
|
|
1. Send us your drawings, using our e-mail:
energy@title24ez.com • Attach drawings to your e-mail:
- preferred drawings formats: PDF
- other accepted formats: DWG, DXF (AutoCad), JPG, GIF, PNG, etc.
- files can be compressed into zip or rar file to make them smaller. What we need for ADU's energy calculations: • Scope of work: is ADU new construction or conversion of existing structure? • will natural gas be available in ADU? • what is the conditioned floor area (CFA)/living space of ADU? • Floor plan(s) - Existing and Proposed (if applicable) - with all existing, removed, altered and new Exterior Walls, Windows and Doors dimensions [ see sample T24 plans ] • Elevation Views (optional) • Orientation of Building (North arrow) • Average ceiling height • Floor: Raised with Crawlspace or Raised without Crawlspace (<18 inches above grade) or Slab-on-grade • Roof: with Attic or Cathedral • Heating and Cooling Equipment details:
-- What type of system will the ADU have: gas/electric Split/Packaged A/C System / mini-split Heat Pump / central Heat Pump / wall heater / etc.? • Hot Water System details:
--
tank / instantaneous / water heater heat pump?
-- gas /electric?
-- existing [ from main house, etc] / new for ADU? • Project name and address • Project designer name, address, phone (can be owner) * You will receive confirmation e-mail within minutes
2. We will contact you after reviewing your project
|
|
|
• Accessory Dwelling Units (ADU) -2019 ADU Energy Code basic
• 2019 Building Energy Efficiency Standards ( effective January 1, 2020 ) requirements
• 2022 Building Energy Efficiency Standards ( effective January 1, 2023 ) requirements
|
|
|
Your business is important to us.
If you do not receive a confirmation e-mail, probably we didn't get the project.
Please call to verify. |
|
|
Most ADU's TITLE 24 REPORTS are delivered within 1~2 business days |
|
|
|